Size: 156,580 square feet (14,550 sm)
The Butler (Tianjin) project consists of pre-engineered metal buildings.
The exterior wall of the office building is designed with horizontal
metal panels and curtain wall system, and the main entrance including
the pedestrian canopy utilizes a steel plate with stiffener fascia system
and includes skylights. The exterior wall of the plant building is designed
using pre-cast concrete panels at base of walls and vertical metal panels
above. Central air conditioning and heating system is provided for the
entire office buildings and exterior louvers are provided in the plant
building for ventilation air circulation.
The main office building includes: main lobby, show room, open and individual
offices, cafeteria, training room, conference room and toilets. The
factory office includes: lobby, conference rooms, open and individual
offices, cafeteria, toilets and shower facilities.
HJM ARCHITECTS, INC. provided complete architectural services for the
project from schematic design through construction administration, and
coordinated civil, structural, mechanical and electrical engineering
services.