previous   |   next

Garrett Automotive Turbocharger Facility
(Phase 1); Amorphous Metals (Phase 2)
Size: 90,000 square feet (8,361 s.m.)

The turbocharger manufacturing facility is a pre-engineered metal building designed with stylwall metal panels and curtain wall systems and a structural concrete slab on grade designed for 250 lbs./sq. ft. on precast concrete piles. The entire building is equipped with a fire sprinkler system and was designed for future expansion. A separate building on the 322,700 sq. ft. site was designed for an industrial waste and sewer treatment plant. Storm water retention basins were also incorporated into the design of the site.

The First Floor includes: lobby/reception, offices, conference room, full service kitchen, employee dining, kitchen, employee dining, men's and women's toilets, locker rooms and showers, manufacturing area, equipment room, battery room, receiving area and loading dock. The Second Floor Mezzanine includes: administrative offices, conference rooms, computer room and toilets.

HJM ARCHITECTS, INC. provided comprehensive architectural services for the project and coordinated the civil, structural,
mechanical, electrical and fire protection engineering services.